免费发布信息
 
当前位置: 首页 » 商务服务 » 网站建设 » 弱電綜合布線流程是怎麼樣?
点击图片查看原图

弱電綜合布線流程是怎麼樣?

  • 发布日期:2019-10-21 11:56
  • 有效期至:2020-04-10 [已过期]
  • 商务服务区域:香港
  • 浏览次数70
 
详细说明

1. 決定好房配線架的位置,然後結合線從外邊進入機櫃的距離,計算出所需的網線長度,方便後期理線,及避免線纜過長影響美觀。

2. 盡量貼着機櫃走,不要彎曲或繞過其他東西,考慮走向方便,避免影響日後網絡設備的進入。

3. 根據計算好的網線長度進行裁剪,並預留10-15公分的長度。

4. 開始埋線,具體步驟如下:

① 線纜根部外露的地方用扎帶綁好;

② 網線紮好後,用配線板理線;

③ 一直順着往下移,在理線板的背部用扎帶纏好。

4. 最後開始打配線架這一環節,並按照事先安排好的位置進行壓線工作。

* * * * * *

創世服務有限公司是一間提供專業數據中心架設公司,擁有一群專業團隊貼心地關注客戶的要求,並提供優質的服務。

想了解更多關於「弱電綜合布線流程是怎麼樣?」的內容,請瀏覽創世官網:http://livservices.com.hk

地址: 香港觀塘鴻圖道37-39號鴻泰工業大廈4樓4室

電話:852-31063235

——————

What is the weak current integrated wiring process?

1. Determine the position of the distribution frame of the room, and then calculate the required length of the cable in combination with the distance from the outside to the cabinet, which is convenient for later cable management and avoids the cable to be too long to affect the appearance.

2. Try to stick to the cabinet, do not bend or bypass other things, consider the convenience, and avoid affecting the entry of network equipment in the future.

3. Cut according to the calculated length of the network cable and reserve a length of 10-15 cm.

4. Start embedding, the specific steps are as follows:

1 The exposed area of the cable root is tied with a cable tie;

2 After the network cable is tied, use the wiring board to manage the line;

3 Move all the way down and wrap it around the back of the cable management board.

4. Finally, start the patch panel and press the line according to the pre-arranged position.

* * * * * *

LIV is a professional data center to set up a company, with a group of professional team intimate attention to customer requirements, and provide quality services.

For more information about 'What is the weak current integrated wiring process?',please visit : http://livservices.com.hk

Address: Unit 4, 4/F., Hung Tai Industrial Building,37-39 Hung To Road, Kwun Tong, Hong Kong

Tel: +852 3106 3235

 
[ 商务服务搜索 ]  [ 加入收藏 ]  [ 告诉好友 ]  [ 打印本文 ]  [ 违规举报 ]  [ 关闭窗口 ]

0条 [查看全部]  相关评论

 
联系方式
  • 刘小茹
  • 已缴纳 0.00 元保证金
  • 资料认证  会员未认证
  • 联系人刘小茹(先生)  [关注]
  • 会员 [离线] [留言]   
  • 电话
  • 手机
  • 地区香港
  • 地址香港觀塘鴻圖道37-39號鴻泰工業大廈4樓4室